Scottish Affairs Committee Actual start House of Commons
Follow its sittingsSimon Miller
And there are, as Jonathan alluded to, as well as economics, there are some geographical challenges, right? These are very remote sites that we're looking to build, that might require a helicopter build or use of ferries to get kit in. There might be many, many miles from roads.
There's a challenge of getting backhaul to those sites so we can connect them back to the core network. There's also a challenge, we've seen this with some Shared Rural Network Total Not Spot sites, of getting power to the sites as well. And above all, we also need for those areas, and this has proved a challenge in the SRN TNS program, we may get onto that in more detail, in getting community and landowner and planning authority consent. And so that too is a challenge. So there's been real progress, but the big nut to crack, I think, is pushing coverage into those areas where there currently is little or no coverage.
Speaker 7
I would just echo everything that's said. Tricky economics in that masts, they have to cover more landmass with fewer people in. And it is very rugged terrain.
So that has meant that Scotland, certainly on geographic coverage, has lagged. As part of our merger, we do have to invest 11 billion into coverage across the UK. Scotland's going to benefit hugely from that. So you said at the moment 90% 4G coverage across Scotland. 5G coverage from our network will cover the same landmass by 2034 and 99% of the population.
So we are doing all we can to try and fill that delta. We think it's very important to do so. We've got to make sure that we get Scotland's figures up and more representative to the rest of the UK.
Patricia Ferguson
So Mr. Robinson mentioned demographics there, Mr. Towers. Would demographic reach be a better measure than coverage?
Alex Towers
I think that's a really important measure. Yeah, yeah. And so EE has currently got up to, and we've looked, this has actually been quite a successful story in the past five, ten years across industry and with government, that we have made big progress. So EE has now got up to 98% population coverage for 4G, 88% for 5G. And yeah, those are bigger than the sort of geographic coverage.
Actually for 4G we're over 80% now even geographic coverage. 5G is behind a little bit because it's sort of following on from 4G.
In Scotland?
Alex Towers
Yeah. So which is slightly ahead of the other operators, but everyone is investing to catch up. And we've put in something like 170-odd new sites in the past decade. We've added 50 new sites under the Scottish Government's 4G Infill programme. So there has been some success, I think, through the UK and Scottish government's initiatives and with working with the industry to fill in some of the basic coverage gaps.
We're still building more sites. We've got some on the go at the minute in Skye, in the Outer Hebrides, in Ross-shire, in Islay. And other operators will be doing the same. I guess there's a second point, which is beyond sort of coverage, because I think we can and will hopefully kind of fix most of the issues there, even though the geography and the economics are challenging. But there are some other issues as well, which go right across the UK, not specific to Scotland, about what we do with the sort of infrastructure we've got and how far we can improve capacity and the service that people get, which does require additional investment.
There's still more to do.
And that's where some of, I'm sure we'll come and talk about this, some of the economics of the industry are a bit challenging.
There's more the government can do on things like planning and spectrum and access to land and all the kind of basic sort of underpinnings of this infrastructure. And there's also been a big question about, I think, resilience and response to emergency sort of situations, which, and I know the committee's been looking at this as well in relation to subsea cables, but it's also relevant to mobile coverage now. I mean, the stakes are a lot higher when there is a loss of service than they were ten years ago. So much more now is running across these networks that's absolutely critical to everyone's everyday lives. And that's where I think we would probably also say there's a, there's an issue about how is government and industry going to sort of share the costs and the complicated investments needed and the kind of protective measures required to think more sort of energetically about that kind of set of resilience issues in the future because they are going to become more and more pressing.
Speaker 13
Mr. Freeman, I'd like to understand, is the infrastructure, the masts, is that regarded as critical national infrastructure?
Speaker 3
The telecoms sector as a whole is designated as CNI. We are not a CNI operator as such, no.
Speaker 14
Okay. Because listening to what you're saying about you've got challenges, maybe it wasn't you, but we've heard that the challenges are spectrum, planning, access to land. On that third point, access to land, other CNI such as pylons, if a farmer in my constituency or anyone else in my constituency didn't want the pylon to go on their land, it would be compulsory purchase.
Why aren't we compulsory purchasing for masts?
Speaker 3
So, recently in across the UK, there's been a change in the way that masts are deployed effectively by the electronic communications code. This has led to a really high rate of consensual renewals of leases. So in Scotland, we've renewed 266 leases, which has enabled us to upgrade 750 kind of services for the mobile operators. When we look to deploy new sites, as has been done as part of the SRN and other programs, we have rights within the code to compel landowners to make their land available in the public interest. To date, we haven't had to use those extensively.
The S4GI program, for example, which we were involved in post-deployment, all of those sites were code agreements that were agreed consensually with landowners. So I think compulsory purchase is something that is used in other critical sectors. It could be looked at, but actually the code is working really well from our perspective and we are able to largely secure land rights on agreeable terms with landowners.
Speaker 14
Well, that's good because compulsory purchase is a last resort. So therefore there isn't a problem with access to land.
Speaker 3
I think from an existing infrastructure point of view, there isn't, we've renewed leases. I think as some of the other panelists will probably allude to, building new sites can be more challenging. You know, you can get resistance to those new sites in areas from either local communities or landowners. And as a result, interaction tends to be more kind of prolonged.
Where you're able to bring the community with you, as we saw in the S4GI program, then you've got a kind of a higher chance of that success. We do try to use the compulsion part of the of the ECC as a last resort effectively where it is clearly in the public benefit and we need to compel deployment.
Speaker 16
Thank you, Chair. So this is to everyone. What more needs to be done by government to increase mobile coverage in Scotland? We'll start with yourself, Jonathan.
Speaker 3
Yeah, of course. I think first of all, we need to define what good looks like. So if we look kind of to the past, coverage was a very good metric. We could we make voice calls, we send text messages. Now we live in a world as as Alex has alluded to where people are much more reliant on a a wide range of services.
And in the mobile market review that's underway, we'd really like to see government articulate a a nuanced view of kind of what good quality looks like. I think government then has a role to support achievement of that.
If it sets that standard, industry will step in. Companies like ours are very willing to invest in new infrastructure, as we have done in other European countries where we see that demand signal. But we are going to face a challenge, particularly in Scotland. It will be putting in place enablers to help us upgrade the infrastructure, but fundamentally in areas that are economically unviable, there's going to be a need for further interventions along the way to ensure ultimately that every community and business gets the connectivity it can rely upon.
Simon Miller
Yeah, thank you, and thank you for that question. I think the mobile market review, which Jonathan alluded to, is a really welcome acknowledgment by the government that the investment climate is difficult for MNOs in the UK.
We're quite unusual as a sector in that the share price of every MNO company working in the UK is lower now than it was 10 years ago. Prices in real terms have gone down and not up. Revenues are flat, margins are low. Our CAPEX has never been higher as a business than it is this year, but we are forecasting that both our revenue and our EBITDA will decline slightly. So growth and investment, it's quite challenging.
And so the MMR, I think, is a positive step and recognition by government that how to thinking about how can public policy increase investment confidence and increase investment.
And there are three areas in three topics in that review that I would I would highlight, I think. One is the possibility of net neutrality reform, reform in net neutrality rules so we can innovate more and manage spectrum more effectively and provide bespoke services for customers which would generate additional revenue for investment in the network. Another one is spectrum fees. Hundreds of millions of pounds are taken out of the sector every year in annual license fees for mobile spectrum. They are set to increase over time.
Amendment of those, which is something the review includes, would generate would keep more funding in the industry for investment in infrastructure.
And then thirdly, spectrum. Data consumption is increasing hugely, there's huge demand for data services. And that means that having a long-term, clear, affordable plan to release spectrum to operators to help cope with that increase in demand is also really important as well. So those three things, net neutrality reform, annual license fees, and spectrum are things that we really hope the review will take forward and we welcome their inclusion.
Speaker 7
Good, yeah. Yes, I'd echo those. I don't want to drown you in asks, but I would have three things as well, rooted in what the committee's just been speaking about. So on the code, we think that's good. You know, a lot of hard work went into getting those code reforms.
They will help rural coverage massively. If that was unpicked or reopened, that would impede rural coverage. We're quite certain of that. So, you know, if there is one ask I could make, please don't reopen the code.
It's working well. The other side of it as well as access is planning reform. We obviously, we want to build out our network in Scotland. We've got to, as part of our CMA commitments. We've got some fairly low-grade planning asks.
We don't want to build masts all over the countryside. We obviously, we hit local opposition when that happens, but this is about upgrading masts in certain areas, making masts on rooftops a bit higher. So just extending the permitted development rights to make that a bit smoother, and that will allow us to deploy our capital a lot quicker and to increase coverage a lot quicker as well. And then the third point I'd like to pick up on about this critical national infrastructure point, because I think it is an important one. Telecoms, we do feel a bit sore in that we are critical national infrastructure.
That brings a lot of obligations on things like cybersecurity, on coverage, which we're very happy to meet because we understand that. It's not always matched in the support we get from government on things like this. And as you say, it's not just on code issues. It affects us in all kinds of ways. Another for instance, data centers are critical national infrastructure.
The Cabinet Office has designated us as such.
They get energy support. We're getting absolutely slammed with energy costs. I think on our side, just at Vodafone, it's over a quarter of a billion a year and rising. No support. So, I think that if government as a whole can close the gap between the obligations and the investment challenges, that would go an awfully long way to helping in Scotland and the rest of the UK, but particularly as Scotland is lagging on some metrics, it will make a big difference there.
Speaker 18
We'll explore some of those issues further this morning. Mr. Towers, did you want to...?
Alex Towers
Yeah, I mean, I'll try and be quick because lots of the same points, I guess. But I mean, yeah, look, investment I think is the key thing. And look, BT is putting in, over the course of the 2020s, we will invest 40 billion pounds in digital infrastructure from fiber to mobile and all sorts of things in between. So there's lots of money going in, but as Simon was saying, the sort of economics of the mobile part of the industry have changed. So for 20 years, it was fine to rely on very competitive dynamic between the operators and a globalization of supply chains that made everything cheaper and easily available.
And those dynamics have shifted. And we're in a different world, more geopolitically sort of challenging. And I think we would say that government needs to just think about the industry differently.
And yes, all the things we've mentioned. I mean, spectrum in particular, we could really do with a kind of roadmap setting out how we're going to get from where we are now to a sort of better place for national mobile services. There are sort of two particular bands that we think should be made available, the 600 megahertz and another one, 3.8 to 4.2 gigahertz. And a sort of approach to how that spectrum is sort of taxed and licensed that helps us to invest more. All the points about planning, absolutely.
Energy costs, super important. I mean, obviously for everyone across the country now, as everyone can sort of see. But we get no sort of relief as providers of critical infrastructure and investors in critical infrastructure from any of the kind of levies and charges that apply as the bill for energy costs goes up inexorably. And we are sort of massive payers and that causes a real issue for us when we look at our investment case.
So we're making the case to government for action on that as well. And then yeah the final point I guess I would underscore again as George has said is about sort of resilience and what it means to be critical national infrastructure providers. I mean there's an example within the last week everyone can see around TalkTalk where that company was about to collapse entirely and in Scotland that would have meant 200,000 customers immediately cut off without any kind of protections around it.
So there's a sort of question about is there some different way of looking at the industry and looking at regulation in future to try and prevent that situation? And in this instance, we were able to step in and sort of perform a kind of rescue, but it does highlight just how important to everyone's everyday lives and their kind of health, all the sort of telecare systems and all the sort of government and other public sector services that rely on all these networks, how critical they always are to keeping people from day to day safe and secure. So a series of questions that sort of stem from that as well about do we have the right sort of regime around, you know, right from one end of the spectrum around the kind of subsea infrastructure, preventative sort of measures to try and protect that, capacity to repair quickly, the availability of more than one sort of cable repair ship at any given time, through to the sort of investments that are needed in resilience for the networks, both mobile and fixed, in terms of battery backup and generators and satellite provision, all the sort of things that you need to put around all of that.
And I think an open question about whether the industry alone can manage all that's necessary, or if actually there's a case for some public investment as well to provide the level of resilience that we're going to expect in the future.
Speaker 14
Thanks, Chair. Um, we've heard that there remains some stubborn areas of Scotland with poor coverage. In big handfuls, the big ticket items over the next sort of five to ten years, what is the industry going to do to close that gap? And we can be as brief as you like on that, because I think we've covered some of it already. If we start with you, Mr. Freeman.
Speaker 3
Jonathan, yeah. Um, yeah, I think as we talked about, in those rural areas, it's going to need to be further interventions and support. The two programs run today, the S4GI program run by the Scottish Government and the SRN program, kind of had different objectives.
So S4GI was about kind of providing capacity and coverage into communities and local businesses. SRN was a bit more focused at geographic coverage. And if we look at that, that stubborn, as you frame it, part, it's going to be more SRN-style interventions that we're going to need in those areas. We as a company have built a large volume of sites across Europe and are willing to put our own private capital into that. But what we do need is that investment signal from government and that commitment to that.
But fundamentally, it will be very similar to what's gone before. We'll need to build sites in more challenging areas.
So things like preferential access to get to power, to be able to upgrade those power supplies where required, and that favorable planning regime will all see us start to start to close that gap. And I think the other thing I'd point out is that a large amount of the benefit that is going to come from upgrading infrastructure, as George and others have spoken to. So continuing that journey. We've actually rolled out 5G a lot faster than 4G, but it is now having an impact on the infrastructure and we do need to make it slightly bigger, slightly larger, slightly stronger. So it's a combination of the two: continuing that acceleration of upgrade to close the kind of the capacity gap, and then further interventions to kind of deal with the coverage side of things.
Simon Miller
Thank you. The government's ambition for 5G plus is for that to be in all populated areas by 2030, and that's the target we are working to. We will in due course, and that's three years away, but we will in due course map out our next steps and our ambitions beyond that.
But I think the focus has to be on those areas where there is currently no coverage and working hard to try and improve the situation in those areas. I think the biggest challenge is in areas which currently have little or no coverage, rather more than premises reached, which is at a pretty high level at the moment. But the priority will be, I think, working on those, trying to get coverage to those remoter areas.
Speaker 7
Yeah, so on coverage, there is a bit of an emerging industry regulator view. Coverage, we are making good progress now. It might not feel like it to some constituents, but things are moving in the right direction and you should hopefully in the next, in the coming months, years, really start to feel that.
Terrestrial, so the ground masts or rooftops or whatever on planet Earth, they are, we're rolling that out at pace as part of our merger commitment as I said. So that is over 99% of people and nearly 90% of landmass will be covered by 5G standalone, so really good quality 5G. The remainder is tricky for terrestrial just because again, the economics are very hard, these are very remote areas. That's where there is satellite and satellite is beginning to come on. So certainly for us, we're partnering with a company called AST.
We've already had Ofcom approve use of our spectrum for those satellites when the constellation goes live, testing hopefully early next year. That will then start to, and as well, this is satellite coverage that is beginning to get quite rich.
So it's not just a backstop, it's satellite coverage that can do certain things that previously only terrestrial coverage could get. You still absolutely need your basis terrestrial coverage, but satellite is going to be able to fill those not-spots to a really good extent. So that's an exciting development for the industry, and that's something that a lot of attention, a lot of thought is going into, and which operators are all lining up propositions to sort that. So that's what'll happen with coverage. I think the only, but as I think I came to this committee a few months ago and I made, you've got coverage, affordability, and quality.
We've had a government that's been absolutely focused on coverage and affordability and reached those very well, but now the attention is how do we deliver good quality? So, you know, even if you've got bars on your phone, are you actually being able to do what you need to do on your phone?
And that's Ofcom doing a lot of good work in that, but that's where the priority now needs to shift.
Alex Towers
Yeah, I mean, I agree with all those things. And, yes, quality is the thing which we also will get to 99% 5G plus by 2030. But that doesn't mean everyone gets the best possible service that they might want and need absolutely everywhere. So, I think we gave the government something like a 40-point list for their mobile market review. And these are not, you know, there's no one big sort of easy lever to pull that fixes this problem for everyone.
But there's lots of small things that can be done, all the things we've been talking about, I guess. And satellite can be part of the answer. I think as we, you know, we will get to 99% coverage with terrestrial 5G. So it's for very much for the kind of final sort of proportion. But it's also very helpful in terms of the resilience of the mobile network itself, not the service that customers get, but the way in which we can back up our systems in case there is an issue with a cable or some other part of what they call the backhaul.
So it's an important part of the mix. But the other point that we haven't mentioned but is also relevant across the UK and in Scotland as well is there are gaps around transport networks as well, and particularly trains, where that is still a massive frustration for everyday customers day-to-day. And that's one of those places where the economics don't quite stack up for individual operators to properly fix that problem. And there's a question for the government and for Network Rail in particular, who could help fix it with a bit of investment and a bit of a more imaginative approach to using the existing infrastructure that is there on the railways already to resolve a problem that is sort of massively aggravating for lots of people every day.
Speaker 14
Indeed. And to any of you who wish to answer this one, the 3G network was switched off.
To what extent has that exacerbated either the coverage or the quality of provision? And what discussion was had before that switch-off? If it has had an effect, was that effect anticipated and quantified, or have we been a little bit surprised and wrong-footed by that?
Alex Towers
I don't think wrong-footed. I think we are actually pretty happy with the way that has gone, in fact.
It's not had a negative effect on coverage?
Alex Towers
Not that we can see. And there are a series of transitions. That was, you know, one of the first, but a series of transitions happening. We are in the middle of a transition for everyone's landlines from analogue to digital. 3G has happened.
2G will happen in the next sort of two or so years, and we're currently planning that. And it's part of the necessary part of effectively upgrading everyone's service.
2G, I think, accounts for something like 0.1% currently of the traffic across our total network. So again, we're fairly confident that we can retire that, use the sort of equipment and the spectrum more effectively for other purposes without causing people a problem. But we need clearly be very careful in how we manage each of these transitions.
Speaker 7
And I'd say government and ourselves take this very seriously. Obviously, if you are retiring something that people are reliant on. So there's a lot of stage processes you go through to to look at what alternative provision is put in place already. 3G was very much done on a a graduated process. We updated government every step of the way as they as they asked us to, as well, quite rightly.
So and and as Alex says, that's being replicated now across other retirement of legacy networks.
So, we we take this incredibly seriously and we think 3G was done in a responsible way.
Simon Miller
Yeah, I mean, it was the 3G switch off, we were the last operator to switch off 3G, but this was literally years in the planning. And it and in advance of switching it off, we ran a number, as I'm sure my colleagues did, of pilots, regional pilots, regional switch offs, you know, to test the impact on the network. We worked very hard to ensure that where 3G was going to be switched off, there would be capacity and coverage to pick up pick that up from those who who previously used 3G. So, it was a very carefully incrementally planned program where we worked hand in glove, as George said, both with the government and with local authorities. And just one more comment if I may on satellite, just to return to that briefly.
Yes, that will have a increasingly important role to play I think, but it's important to recognize that it's already being deployed. I mean we have used satellite to give backhaul links back to the core network from remote sites and we launched O2 satellite earlier this year which is a satellite to device service which has lifted our coverage footprint up something like 95% of UK landmass and is partic of particular value in bringing coverage to not-spot areas.
Speaker 22
Yes, thank you chair. I just want to follow up on the the satellite piece. So you mentioned obviously O2 have already sort of rolled it out. Will that be an additional cost to consumers or will that be used where there's no 4G or 5G coverage to allow them to actually still use their their phones as as they were?
Simon Miller
It's a complementary and supplementary service for which there is a small charge to customers at the moment, yeah.
Three pounds.
Angus Francis MacDonald
All right, okay. Thank you, Chair.
George Robinson's had the thick end of our tongue before, but the three of you have yet to have it. So I represent Inverness, Skye and West Ross, okay? And the chances are they're amongst your most difficult landmass to cover on the west coast. And I live in an area which is not, which is reasonably populated, i.e. there's 50 houses. If I want to get any bank access and they send me a text, I have to run like hell down the garden, get my text, run back and enter it into the computer before it times out.
So that, that happens to me and that happens to our whole community.
So we do not have mobile coverage in a reasonable community where I live. And your statistics here, I'm just going to read a little bit, Scotland has roughly 80% of 4G, 80% of 4G geographic coverage compared to 90% of the UK. And for 5G it's 48% in Scotland versus 73% of the UK. In where I live, I suspect in the West Highlands it's down at 30%. So there is a, there is a major crisis going on where the school rolls in the West Highlands have halved.
So Portree High School was built for 1,000, there's 500 people there. And the professional people are moving away.
And lack of communications is an important reason, or is a major reason why they are moving away. So we sit around here and the numbers sound great, 90% moving this, we're going to achieve that. The net result is we are seeing massive depopulation in remote Scotland, significantly because our communications is not good enough. And so, you know, I leave this meeting thinking you guys are all thinking you're doing really well, and I think you're doing really badly. So that, I mean, I hate to say that as the reality of it.
Do you have a question, Angus?
Angus Francis MacDonald
The question is, when can you get it sorted by? And you know, George, you've answered this before, but things like sharing masts.
You know, we were in the Faroe Islands and the head of the telecoms thing, he said, "You don't understand it, if you shared masts, the problem would be largely resolved, or significantly resolved."
Speaker 7
I'll do a quick supplement. And so I would say the principle is, yeah, we can talk about facts and figures, if it's not the lived experience, then it's not cutting through. So that is very important. And rural roaming, I think if there's no signal, there's no signal for any of us to roam to. So that is when neutral host architecture can be useful, which I'm sure Jonathan will expand upon.
And I would say as well, we are responsible on the roaming side, we do try and share our masts and our kit wherever it makes sense. So certainly Vodafone Three, because of our merger, we actually share sites with BT. We share kit with VMO2. We use neutral hosts.
So we do an awful lot of sharing. Where sharing makes sense, we do try and do it. While also where you can protect the principles of in the areas where there is good coverage and competition is driving that investment, yes. So the system, we do try and do it in a sophisticated way that does ensure that you're not, you have as few of these instances as possible. If it's, you know, and it does show the importance of connectivity, if that's a driver of depopulation, that's a huge issue and that's something that we need to sort.
Speaker 3
Yes, so building on what George said, absolutely respect the lived experience people have. I think from what we see, we're a European company. Actually in UK, it's one of the highest levels of sharing of any country in Europe. So we have 1,200 sites in Scotland and we have about 2,200 MNO points of presence.
So there's kind of a sharing ratio of about 1.7 there. If we look at the S4GI program, actually the sharing's up at 2.5, 2.6. So you've got nearly every operator on every single S4GI site that was deployed. So I don't believe this is a problem of a lack of sharing. The UK telecoms industry's actually done a fantastic job of sharing.
Neutral hosts such as us and our other competitors in that space, this is our reason, this is our business model. We want as many companies to join us as possible, including non-MNOs, we host other providers on it. So I think as George pointed out, to close that experiential gap, it's going to be new infrastructure. There's always more we can do, there's always more we can share on, but it's actually already pretty high the sharing. So it's going to be about finding better and more efficient ways to deploy new infrastructure to then bring that service to constituents so they get the lived experience that they would hope for.
Simon Miller
Yeah, sorry, forgive me. I mean, we've been sharing infrastructure with Vodafone since 2012. And at the core of the Shared Rural Network program was infrastructure sharing by all four operators. So I think it's been going on for a long time. I think there's more now than there was five years ago, there'll be more in five years than there is now.
And that's certainly the direction that we need to go in.
Angus Francis MacDonald
Thank you. I'm actually doing the next question as well, but it's on a slightly different subject. It's on Shared Rural Networks. So just to get my notes here.
So how effective do you think shared rural networks and the 4G infill programs have been in addressing mobile connectivity?
Alex Towers
We're probably going to go back around some of the same territory we've just been in, really. Look, I mean, I think we would say in aggregate, quite very successful, actually, in terms of the difference it's made to closing those big kind of numbers in terms of gaps in coverage and the fact that most of the infrastructure, the SRN and the Scottish Government's 4G infill has been of the sort that has allowed operators to share and so brings that kind of wider benefit. So that has been a really positive intervention. And then the question is clearly, like as in your case, there remains a percentage that it doesn't cover and it's no consolation at all to you that there is a kind of, you know, in aggregate these sort of large numbers where it has been a success. So that remains the challenge.
Angus Francis MacDonald
Can I actually change my question a little bit?
So originally it was about landmass covered rather than population covered. And I was on the Highland Council Planning Committee and we would get all these SRN applications and it completely snarled up the whole planning committee. And then I got my new job and I arrived and we sit down with Chris Bryant, at the time was a minister involved, and we explained that we really didn't need masts twelve miles up a glen where nobody lived. And it would be much better to put them on, you know, the coastal areas, on hills where we could make the difference. So I think very sensibly the government have reduced the number of SRN masts required in remote, remote glens.
But we haven't seen them instead being replaced in places where we think we need the demand.
And I don't know if you've got any input on that.
Alex Towers
Yeah. Well, and look, transparently, so the first part of the SRN program was delivered by the industry, and that was to close mostly what we call partial notspots. And then the total notspots, that was where the government were due to sort of make an intervention. And you're right, it's sensibly they sort of took a view, I think, that places that were literally kind of most of the time empty may not need a new bit of infrastructure, but they have reduced the amount of of funding they were going to put in. So that is a change.
And there what we're talking about in the end, I think, is a question of of potential market failure for a place that where there may not be a business case for any of our for competitive purposes any of us to to put new infrastructure. Then what is the answer to that? And it may be there is a sort of neutral host shared bit of infrastructure that would require some sort of public investment, for example.
But that remains, I think, a sort of a live question for communities that haven't yet got the infrastructure they want or need.
Speaker 3
I think the two programs were very differently designed, I think as I mentioned in my earlier answer. The S4GI program was about covering communities and businesses. SRN was largely about increasing geographic coverage. And I think that's at the heart of the policy decision we have to decide upon for future intervention. Because if you design the program with the right objectives, then you'll build the associated infrastructure.
And as we saw with SRN, it it led to infrastructure being placed for geographic coverage, which may be important in the future as things like agribusiness, advanced logistics cases kind of emerge. We may actually need that coverage there for that. But today, you know, we understand obviously from your constituents' point of view, that's the pressing priority for them, not those kind of future use cases.
But they are very different how they were designed as programs and what they were designed to achieve. So I think we need to always think at the start what outcome are we trying to get to here because it can lead to kind of unintended consequences.
Maureen Burke
Thank you. Excuse me. Could I ask what lessons have been learned from the rollout of the 4G in Scotland and how are you applying these lessons on ongoing rolling to the ongoing rollout of 5G?
Speaker 3
Certainly. So 4G the UK was relatively late to actually roll out that technology from by international standards and it took quite a long time to roll out so it took a long time for that. I think there's been an awful lot learned from that program which has meant 5G we were one of the first kind of countries to start the rollout and it's accelerated much more quickly.
I'm my colleagues here will no doubt speak from a kind of more of a networks point of view. From an infrastructure point of view, what we've learned though is that we do need to get ahead of the curve. We need to be upgrading the infrastructure, the physical metalwork if you like, to make it stronger, slightly taller, slightly bigger in advance because the new equipment is much heavier, it's much larger, but it has much more of a bigger impact. So the big lesson we learned was the idea that you need to prepare the infrastructure. The thing that's perhaps been more challenging is 5G uses a lot more power as we see by the consumption the operators have and we weren't and have not today yet been able to get that access to upgraded power in an easy way like many other industries kind of in the across the UK and Scotland.
So getting those power upgrades and getting prioritized in that queue is challenging.
So we can have sites that are built, have all the equipment on them, but they are sat there waiting for kind of the power upgrades to switch on the the 5G part. But I think we've learned the lessons around the infrastructure side, but perhaps the new challenge now becomes more around the power. And if we can get a little bit more on the planning side, that will help accelerate things as well.
Simon Miller
Um, yeah, I think the key learning from the Shared Rural Network program, which was about 4G, was that, uh, it's really difficult to punch a hole in those areas of total not-spot coverage. If you judge the SRN program by the objectives it set, it has been a success, I think. As I mentioned earlier, that the the landmass in Scotland where you can get a 4G signal from all operators went from 41 to 71.
Our UK landmass coverage is at 88% and was by the end of 2024, which is a key target of the SRN program. We'll all be at 90% by the end of this year and our collective footprint, our combined coverage footprint is at 95%. So that's been a success. The real, I think, the key learning is how difficult it is for a combination of economics and community and landlord and planning authority consent, how difficult it is to build in those total not-spot areas. And it is a source of some frustration, I think, that the industry invested half a billion pounds roughly in addressing partial not-spots.
The total not-spot part of that programme was funded by government, and that was significantly scaled back because we couldn't get permission to build the sites in those total not-spot areas. And you can argue that it was sensible to A, scale it down, and B, focus more on premises and those places, tourist destinations, etc., where more people are to be found. But that has been, it's a little frustrating that, I mean, in that particular case, money wasn't the problem really. You know, a lot of that government money went back to the Treasury because we had to admit defeat on building sites where we wanted to. So I think that's a key learning, that that is the real challenge.
And I think some of the challenges that we have in remoter sites in Scotland, we will continue to have with 5G. I think it's, these are very remote sites, you know, many miles from roads. They might require helicopter builds or ferry transport to get the sites in.
Getting backhaul back to the core network can be a challenge. Getting power to the sites could be a challenge. We've got some sites, total not-spot sites, that have been built and ready to go since last year, but we still don't have power. Now we're working hard with SSE to put that right and I think we're going to solve that issue. But I think that too can be a can be a cause of delay.
Speaker 7
As a build on that as well, I'd say one thing about the 5G rollout is we do now have a lot of the masts. So when they need to be upgraded in future, the sites are there. So that is good. In some ways, a lot of the pain we're going through the building pain now. So I think of our 3,500 sites in Scotland of the upgrade program, only 250 are new.
So that's obviously a much smaller proportion than having to build all of those as new sites. So that helps. I think though that where do we how do you supplement that next?
There is the satellite angle. How do we make sure satellite's done as well as possible and does fill remaining gaps? There's also small cells, so like small boxes that you put across cities and just to supplement coverage where it's needed. So how can that be done as effectively as possible? That's something which operators are doing now, but it will, as it becomes increasingly so, how do we, as we've made masts easier to build, how do we make it as easy as possible to build out small cells?
The demographics versus landmass challenge. Yeah, so I think as well, we're doing all of this, and I know DSIT is talking to us all individually because it's obviously sensitive information, but once we've built out our networks as we've said we are now, where are those gaps left?
And then we can have a sensible discussion with government, how do we fill those? And maybe that was a lesson, if we are doing areas that did not need coverage through the TNS, why did we not do areas in your constituency first? How do we make sure that doesn't replicate itself? I think that's a lot of where it really boils down to, is understanding we're all doing these amazing build programs, where are the gaps going to be, and how do we make sure they're filled in good time.
Alex Towers
Yeah, and I haven't got much to add. As George said, the sites are sort of mostly now built, which is a massive help. In towns and cities, it's still all the planning issues massively relevant to small cells and upgrades, and anytime a landlord wants to remove a site, that is a painful process with not enough time, we think, to give us a chance to find an alternative site.
So all of those issues continue. And I mean, the other thing, I suppose, to learning from the 4G experience and thinking about 5G is this point about kind of resilience, in particular with, you know, increasing frequency of extreme weather events and climate change. And there is an obvious vulnerability in sort of major storms, like has been a particular issue in parts of Scotland, and that remains a vulnerability. We still feel like we don't get a kind of sort of priority ranking in terms of who it is that the energy operators have to attend to first when there is a power outage. And we think there's more that could be done to just join up the planning across telecoms and energy networks because they are so interdependent.
And if you're just a normal person, you clearly need kind of both to go about your ordinary life. So there's a point there.
Maureen Burke
You've spoke about the challenges on 5G. Do you think that there is a risk that Scotland could fall behind in the rollout of 5G? Do you think Scotland would be behind all that?
Speaker 7
The stats do show that certainly on 4G and 5G, Scotland has lagged. So on our rollout programs, though, we're absolutely focused on filling that gap. And then the next question we're going to have to tackle as an industry: what is 6G? But then how do we make sure that we do implement 6G as well as possible? I'd also say it's a UK issue.
The stats do speak for themselves that as a country we have been slow in 4G and 5G rollout for various reasons, mostly the economics. How do we make the economics work? We've got very good affordability in the UK, but then that does mean the investment envelope is smaller.
That was really the story of 4G and 5G. And now as we look to, Ofcom say it themselves, we're bottom third of OECD countries for connectivity. We're desperate to get to the top third, top 10%. We're laser-focused on that. And that again, that's we've spoken earlier, the issues we're talking to government about to try and solve that.
Speaker 14
Thank you, Chair. Mr. Robinson, Vodafone Three are a massive corporation with a global footprint. So how does the UK and its rollout compare to the other markets that Vodafone operates within?
I'm thinking in terms of what you said there, that we were a bit slow in the rollout and that was mostly down to the economics. How does it differ in other countries around the world? What different approach, for example, I was fortunate enough a few years ago to be up the top of a mountain inside the Arctic Circle at the very top of Norway where they had full 5G coverage to my great surprise. What have they done differently that we could learn from here?
Speaker 30
I think they would laugh when we say Scotland is remote and has some rugged terrain.
Speaker 7
Yes, yes, yes. So there's again, Europe as a whole, the competitiveness of telecoms in Europe is very high compared to other countries.
And when you look at affordability, you can get a SIM for about six pounds in the UK versus in the US it's fifty dollars. And we're not saying, you know, we don't want skyrocketing prices, but I think there's just an understanding of twenty percent of the market is run by virtual network operators as well. So it drives huge amounts of competition. Obviously countries like Norway and Norway I'm not particularly close to, so I can't say exactly why they are so far ahead. I am aware they are far ahead.
I'm also aware a lot of the countries in the Far East, so Singapore, Japan, South Korea, I think South Korea is the 5G leader. They've got incredible, incredible coverage there. I think gigabit level speeds of mobile. How have they done that? I think, I think again, where the every country's different.
So where the countries are a bit smaller and easier to cover that geographic space, that always does help. Where you've got good planning rules. I know it might seem why does planning have such an impact? It has a huge impact if you can deploy quickly. So certainly I know our mast height rules are the most stringent in the UK compared to other countries.
I think in some countries you can build pretty freely up to 50 meters. Here it's 15, 20 meters, protected land everywhere. So again, where can we make sensible changes there? So that's marked us. So we've got those problems.
Europe as a whole, very competitive markets that drive very low prices, that drive smaller investment envelopes and planning. A lot of it does come back to planning as well.
Patricia Ferguson
I don't know if any of you will be able to answer this question, but if any of you can, I'd be really interested. So if at the conclusion of the Shared Rural Network project, 9% of Scotland's landmass will be without 4G connectivity, how does that translate to community and to people? Is there, has work been done to identify that? And if so, what, what are those areas, if you know? Sorry, I'll look for a willing volunteer for that one because I realize it's slightly tricky.
Speaker 7
So I, I, as I was, as I was running the last one, I get 9, so 90% landmass, but 99% population coverage. So that is where population coverage is very useful. Obviously, you know, that remaining 1% there will be some where it is particularly hard though.
But it's also making sure when it is saying 99% that you are getting that coverage as well. And that's the work that Ofcom is doing, which we're supporting, which is making sure that when the map says you've got coverage, you actually can use your phone. It's not just an icon on your phone, but it's usable.
Speaker 34
So not Mr. McDonald having to run down to the bottom of his garden to get a signal.
Alex Towers
I think that is the key point. 99% population coverage in terms of economic activity should deliver most of what we want to. And if the landmass that's not covered is effectively mostly empty, then perhaps that's, you know, there's definitely important questions to think about around agribusiness and all that sort of stuff, but if it's really literally empty mountainous sort of terrain, then maybe that's not such a problem.
Speaker 37
Thank you, Chair. Mr. Robinson, you did remark in an earlier answer the question how do we make the economics work. To what extent is it commercially viable for you to provide, and my question is to all of you, 4G coverage to the remaining areas not reached by the Shared Rural Network?
Speaker 7
So 4G and then 5G, 5G SA, that's now our target really is to make sure you are getting this good coverage. So 90% on terrestrial. I think the remainder where we can work with Scottish Government, where we can work with neutral host providers, that will go some way. And then satellite is the other play.
And as I said, satellite, it's a nascent technology, but it is getting to a point now where it can start to provide a level of coverage where you can do most of what you need to on your phone within the next coming years.
Simon Miller
Yeah, I'd agree with that. And I think it's also just to briefly return to the TNS element of the Shared Rural Network, where the number of masts that were envisaged to be built under that scheme was very significantly reduced and the location of them was moved from remoter areas to more populated areas. I do think there's a big challenge around getting community and planning authority consent.
And as I said, one of the frustrations we have about the TNS program was that the money was there to build the sites, the willingness was there to build the sites, but we couldn't get permission to do that. And that is a tough nut to crack. So I think we need to keep talking with those communities and keep that dialogue very much open to make the case for connectivity and to put ourselves in a position to meet that need and to persuade these communities to take the infrastructure that's required to give them the connectivity they may want.
Speaker 37
Other additional incentives that you would need to extend coverage to these areas? You did say that it requires sensible discussion with government. And you also touched on perhaps relief on energy costs in an earlier answer.
Speaker 7
Yeah, so obviously filling the gaps, what's happened in the past is joint initiatives with government, which have, which as we've established, you know, S4GI worked well, EAS worked well, SRN, yes, it went a huge amount of the way, so there is that discussion. I do, so for these remaining areas which are particularly remote, satellite I think will be seen as the solution. Just because building, I think some masts building out in these areas it costs about a million pounds. And if it's only got one or two people using them a year, is that, is that sensible if you have got enough from satellite?
On energy relief, yes, I think if government came to us and wanted to have a sensible discussion about coverage obligations for support in other areas, that's absolutely something that can happen. I know in other countries with spectrum fees, they sometimes instead of instead of us paying fees on the spectrum, they will put in coverage obligations. So that is a that seems sensible. That seems another way for the government to achieve its objectives in a way which incentivizes our business in a sensible way.
Speaker 37
Is it possible therefore at some point in the future that 100% coverage could be reached if government extends the coverage obligations?
Speaker 3
I think with 100% coverage, the curve gets exponential in terms of the number of sites you would need. So you know, we're at 90, 91% geo coverage. Can we push that terrestrially to 92, 93, 94?
Probably if we can get the right frameworks in place and the right enablers to deliver. But I'm not aware of any large country that has 100% coverage because as I say you get to this exponential point where you are literally building tens of sites to serve areas. So I think 100% is unrealistic. Pushing terrestrial as far as we can is a good thing to do from a sovereignty point of view, from a resilience point of view. And then as others have said you will need to probably think about other technologies for the final part.
Simon Miller
Yeah, but you raise an interesting point about coverage obligations. When O2 got its 4G spectrum many years ago now that came with a coverage obligation to reach 98% of the population. And I think that did help pull not just us of course but the whole industry up. You know we leveled up. And that they could have a coverage obligations could have a future role to play possibly, yeah.
Patricia Ferguson
Can I just ask, planning has been mentioned a number of times. And I'm thinking of a case actually in my own constituency, which is very, very urban. But there's a very controversial proposal sitting at the moment. And it doesn't feel as though operators have thought very carefully about where this particular installation should be located.
I just wondered generally, and not specific to my constituency, how much work goes into deciding exactly where your infrastructure will be located? Because this one in particular, but I've seen others in other parts of the country that are more rural, that have seemed to me to be odd, put it that way, or not the best fit for a local community. And it seems to me you would perhaps get a little bit further if you were to take communities with you, rather than perhaps just deciding that's... I don't know what your criteria is. Is it commercial? Is it a more broadly based consideration?
Alex Towers
Look, I think it's a really fair sort of question to ask. I can't comment obviously on the specific. We do spend a lot of time on this and we try and think really responsibly about it. I'm sure we get some wrong. And it's always a combination of sort of the community factors, the engineering, the cost, the sort of network design.
You know, it's a complicated set of factors, as you can imagine. There's sort of various problems with it from our point of view.
Principally, it's a kind of time and money sort of issue. So we put lots of time into the kind of planning, planning of the planning application, if you like. And then it's a sort of six to nine month process to get an answer. In aggregate, I think something like half or two-thirds of them get sort of rejected. We then appeal.
Most of the appeals that we win. But the amount of time that's been sort of wasted in that process and money spent sort of slowing the whole thing down. And I don't know what the Norwegian planning system is like, but other countries definitely do this better. Some of it's actually just about there being more planning officers available to do the work in local authorities. And look, I'm conscious lots of these things, as with energy costs, as with logistics, there's a sort of wider fiscal kind of set of constraints at work here.
But it would make our lives a lot easier if there were more resources available to make this kind of process quicker. Absolutely. Should, in some cases, we probably get it wrong ourselves. There are some specific adjustments that could be made that would really help. I mean, one, one of these is to sort of slightly expand the category of what is permitted development and where we can put things without having to go through that process.
Clearly, that would then put an obligation on us to be responsible about where we do that. And the other is the way that the process works when we want, when the landlord of a, of a building where we have a site, usually something on a, on a roof, wants to remove our, our apparatus or do something with the, different with their building or whatever. It's called a notice to quit. And we only get 18 months in that situation to find an alternative site.
And that's actually not very long, given all the factors I've just sort of laid out, to find an alternative and go through the planning process and get it up and running and get the power and all those sort of things. So we've been arguing quite strenuously for a while that we think a doubling of that sort of length of time would make a massive difference to avoiding the problem that you get in urban environments where suddenly the signal will disappear for a while while we're kind of messing about trying to fix that problem. So there are a number of, and again, this is quite boring and technical sort of business of government, but if all of these levers were to be pulled, it would make a big difference when you look at the total picture.
Angus Francis MacDonald
I just want to challenge you about this community and planning. Because that's what I do, I go around the communities and I know them really well. I guarantee a community that has not got mobile phone would be desperate for it. They would be desperate. So they are not against it.
They may be a site for some reason. If you had like a local community's liaison officer who was from the area, who sat down with the community council and discussed where it best go, I promise you that would get rushed through. So I'm afraid to say it's the way it's in my opinion, the way it's managed rather than the reality.
Simon Miller
Yeah, I'm happy to respond to that. No, thank you. I don't think that observation would be wholly aligned with our experience on the TNS program as I said. But what I and what I would say is that in terms of where proposed sites are located, that is they are decided upon after extensive planning and analysis by our network engineering teams.
And what drives that is which sites will best suit and meet customer need. The, you do raise an interesting point though about community consultation and pre-planning application consultation that we do with local authorities. We do have to make that as, as good as we can and as effective as we can to ensure that as far as we can we are acknowledging and addressing all those concerns. And that's something for us to take away and learn from, absolutely.
Speaker 14
Yeah, and just, I'm quite surprised to hear the, Mr. Towers, to hear the notice to quit scenario that you have to deal with. Is this on specific sites, or is this on buildings, or is it on land, or, or how does it, how does it work?
And in the context of the CNI, is it your ambition that this latitude that landlords have would be very much tightened up?
Alex Towers
Yes, it's on buildings in basically in urban environments. And what we would like is more a longer period of time to adjust. So a landlord can say to us they've changed, you know, their approach, they don't want the site on the building anymore, that's fine. It's the amount of time we then have to make to find an alternative site effectively that's at issue.
Speaker 41
So they want part of the building, but you're on the roof, you're not interfering with the use of the building.
Alex Towers
We're on the roof, but they can they can decide they don't want us on the roof anymore, that's that's their right. It's the length of time we then have to to find an alternative site effectively that's at issue.
Yeah.
Speaker 47
Right. So it's maybe gone from commercial to residential and they don't want it.
Speaker 3
Yes, I think, I mean, where you see it, how how common is that? So in London, in particular, as a site provider, it's becoming an extremely challenging environment because you can see the development going on and there'll be parts of Edinburgh and Glasgow experiencing similar activity. I think as Alex talks about, a longer period of time to deal with it is absolutely critical because now we've got sites that go off air and, you know, literally you lose the signal. I do think something about a a right to go back, you know, once the development has finished, and we do see that in other countries where you have a right to then be reinstated on the roof, would be helpful and be accommodated within that development kind of path. You know, we do manage to achieve that quite often with some developers.
I think the sheer volume of development going on at the moment is resulting in real challenges here in London, but also in other environments. Unlike other critical utilities, we don't have that right to go back. If it was a gas main you were moving or an electricity cable, it would have to be reinstated.
We don't benefit from that. And while that remains the case, we do need that longer time period to deal with the issue and not impact end users.
Alex Towers
There is, I think there is a broader point there about, yeah, exactly, telecoms now is much more similar as an essential service to some of the other things that Jonathan's talking about. I mean, in a sort of parallel example, Openreach are not able to go in automatically and upgrade people's connections from a sort of old-fashioned copper to a fiber connection in the way that other utilities have automatic rights of access in order to fix problems and upgrade things.
And that's leaving kind of a million households with their fixed broadband connection with something suboptimal, basically, without any unless they can get their landlord to agree and often they can't get hold of them to do this, they're kind of stuck. And there's just a sort of general point here about what kind of service we're providing here and how important is it to people? We're in a different world than we were 10 years ago.
Speaker 22
Thank you, Chair. We've heard already this morning about 90% coverage. But as a consumer, unless I have three different SIM cards, I'm not going to have 90% coverage. So I guess it's back to the point, should there be more sharing of infrastructure, especially in rural areas? And maybe Jonathan, if I'll ask you first of all, do you think that should be mandatory in some rural areas that we actually share or, you know, operators have to share their infrastructure?
Speaker 3
So I think as we talked about, sharing's already very high in the UK. So there's no restriction on sharing. In fact, the vast majority of sites in Scotland and across the UK are owned by companies that want more sharing.
Our commercial model is based on operators sharing more. Mandating is, is challenging, as Simon's alluded to, each network is planned individually and therefore needs to take into account where other sites and other items are. So I think if we move to a mandated world, it would be tricky from a network planning kind of point of view. But what I would say is 70% of sites have more than one operator on them already, and the companies that own them like ours, our business model is based on attracting more sharers onto our site. There's no, no restriction from our point of view.
The thing we do need when more people come on is to be able to upgrade that infrastructure. So rather than building a new site, which may have a visual impact to communities, if we can upgrade what we've got, a little bit stronger, a little bit higher, then that can have a real impact.
But I think that's the key here. It's about recognizing there is a model that's working of sharing. It's a very open environment in the UK. And then we have to respect that operators need to plan their networks and in some areas, as George talked about, there is a competitive advantage to be driven.
Speaker 22
Moving across to the operators now, and so when you think about sharing, when do you decide where you will share or when you try and keep almost competitive advantage over anyone else?
Speaker 7
Yeah, I suppose it's, so the first point, if there's no coverage, there's no roaming to be done in the first place. And if it, as the SRN and others did, it becomes clear that the market is not going to deliver in that area the coverage and it should, then that's where a discussion is to be had with government on how we can do that. In terms of, but and the mandatory aspect of it does need to be carefully done because talking about incentives, how do you incentivize us to build into areas if when we build into somewhere we've then got to let every other operator on it?
That would weaken the incentive. So, but if that's not, means we're not then building in an area which we absolutely should do, then that's where we need to, that, that, that's a market failure. And that's where we need to look at neutral host operators and what can be done. And certainly those discussions are always ongoing with government. Government will talk to us about a particular area, why's this not got coverage, XYZ.
I think if it then transpires that it really is just deeply uneconomical for a single operator to do it, hence the Shared Rural Network is born, or S4GI, or EAS. So, I think...
Speaker 7
So if there was maybe more, as we've already spoken about earlier, coverage obligations, then that would force you guys to actually make sure there was more sharing in place and to make sure you work together to provide a service for our rural communities. Yeah, I suppose the coverage you start to get back to though, are we serving the communities we need to or chasing a coverage goal? So how are we always making sure we're doing what the country needs, what local communities need? We always want to be laser-focused on that. And again, I'd return to it, satellite is going to help a lot here.
It is going to do that, some of those areas that are just for a terrestrial mast deeply uneconomical. So, and final point as well, we are investing a huge amount in Scotland as part of our merger. So a lot of areas that do not yet have coverage will be going to 5G standalone as well.
So a lot is being done. And what I'd revert to is, and I know what DCMS is looking at is, when all of our build plans for this cycle are done, what is left? And then what is needed to fill them, whatever it may be, whatever solution. I think a lot of it boils down to that as the answer.
Speaker 22
So I guess there's no regulations that stop you sharing just now because you're already doing it. It's just that actual will to do it. Maybe Simon, if you've got...
Simon Miller
Well, I mean, I think the economics of the industry is driving us all towards greater infrastructure sharing. It's more cost-effective, right? And as I say, we've been sharing our infrastructure...
Simon Miller
No, but it's happening more and more. One could argue it's a natural evolution of the market and driven by the economics of the sector.
We've shared infrastructure with Vodafone since 2012, and all four MNOs shared infrastructure as a key, that's at the kernel of the Shared Rural Network. So I think we're going to see much more of it over time. I think that'll be a natural progression and a direction that we move in. But to Jonathan's point, more infrastructure sharing like that will require stronger masts, wider masts, and taller masts to get the kit of four operators on, three operators on.
Speaker 22
Okay. And well, I guess last question I have, in terms of, okay, your coverage isn't 90%. What is your coverage for each operator?
In Scotland?
Yeah.
Alex Towers
So we are 4G 98% population, 80% geographic. 5G 88% population, but only a quarter of the geographic land area at the minute.
Simon Miller
Yeah, 4G landmass is about 71% and the population is about 99%. And our 5G Plus is at about 82% of Scotland by population at the moment.
Lillian Jones
Thanks very much. So this is to each of the panel. And I know that you've touched on it before, but just to ask the question again.
Your key asks of government in terms of the mobile market review, specific policy, regulatory or investment measures that would help improve the business case for long-term investment in mobile connectivity. So just if you could just make it clear.
Speak to the camera.
Alex Towers
Okay. So we would say, and as I say, we've given 40 suggestions to the government through that review process, but big headings would be planning reform, approach to areas of market failure, transport in particular, but also any of these sorts of ones we've been on about, very, very rural places that need public investment.
A spectrum roadmap to double the amount of spectrum available for national mobile operators to provide these services and to do something about the way that the spectrum is licensed and taxed effectively. Reform of the net neutrality or capacity for us to provide different services with our 5G networks that require slight adjustment to what they call net neutrality rules. Basically, it means for us to get revenue from big over-the-top providers to improve the amount of investment we put into services for everyone else. A reform of energy costs to ease the sort of pressure of that increasing burden on us as providers of national infrastructure and a sort of set of measures around resilience and emergency sort of supply effectively, where we think there's more for government and industry to do together. Those would be the highlights.
Speaker 7
Planning sits outside of it, but also England is consulting on planning reforms at the moment, which will go some way to helping us, including the notice to quit issue. I will say Scotland's always been pretty good at planning. I think they are forward-thinking and they do work with us well. But we do want them to go a little bit further on permitted development rights where it's sensible and again is not about building new masts where people don't want them. This is about extending the height and the width in places where it... where it makes sense.
That will ease a lot of the planning burden and allow us to deploy quicker. I'd say cost base, anything government could do to support our cost base. Energy is the big one. As I said, hundreds and hundreds of millions and it is compounding every year. And we do think... and a lot of energy costs are put on businesses to incentivize them to use the network at different times.
We can't do that. We need to run all the time. So our argument to government is that actually a lot of these non-commodity costs just don't apply to us and they shouldn't.
You should disapply them as you have done to other sectors in similar, with similar structures. And a third one as well, net neutrality. And I know it sounds a bit, it does sound very technical, but it is reforming old rules in a sensible way. We've got a very smart 5G standalone network now coming into play, which we've spent a lot of money on. You can do a lot of very cool things with it.
So what we want to do is to be able to do that, to offer specific products to people that helps us monetize the network to allow us, and if we can monetize it, that then allows us to invest more. So for Vodafone Three, those are the three priorities that we've put forward to government.
Simon Miller
Yeah, net neutrality reform certainly, spectrum release and a long-term plan around that, and looking at annual license fees for mobile spectrum.
Speaker 3
And yeah, from an infrastructure kind of perspective, I think it starts with what quality of networks do we want to deliver where, and then building a set of policy interventions around that. So probably split between the enablers that others have spoken around, access to power, better planning rules to upgrade things. And then also looking at where government is planning to do things already. And Alex mentioned the rail network, for example. That will undergo a massive upgrade in the shift from its operational network that's going to be built.
And there'll be a lot of new sites built for that. So where government's already investing in infrastructure, making that capable of supporting public mobile operators as well, because that will leverage that. And I think, yeah, we'd agree, like looking at things like annual license fees and trying to redirect them back into investment into the network that delivers outcomes for consumers and businesses.
Maureen Burke
And this is to all. How effective has the Electronic Communications Code been in supporting the delivery of mobile connectivity in Scotland?
Speaker 3
I think it's fair to say it's been a really great success story. I think as we've mentioned a number of times, the changes that were put into the code move telecoms to a world that other critical sectors have. You know, when you're building power lines, you're putting gas mains, when you're putting roads through things, it's looking, it's assessing the impact of that in the same way. As I say, in Scotland, we have renewed 99% of all our leases consensually with landlords. What does lease renewal mean?
It means that you can upgrade the infrastructure, you can put additional sharers onto it, and it means that communities can benefit from new services.
We're not having to continually kind of negotiate around that. I think the other, so that, so that program that we've run of lease renewal has meant that we can upgrade 750 services basically because we've got the rights now to do what we, what we need to do. So I think it's been a really big change, probably one of many we're going to need as starting to see telecoms as a really critical industry and putting it on a similar footing to the likes of gas, electricity and water that have this similar kind of regime around valuation of their use of land.
Simon Miller
Yeah, I'd, I'd echo that. I mean, I think it's been a, it's helped make the rollout and enhancement and sharing of infrastructure easier, faster and more cost-effective.
Speaker 7
Just very quickly, one correction to the record. I said 70% 4G coverage in Scotland, it's closer to 80%, so I do apologize.
On the code, yes, please don't unpick the code. I think we worked, we did work hard to get there. It's obviously, it is a complicated balancing act on rights of landowners versus rollout of coverage. I think what's incumbent on us is to always use the code as responsibly as we can. And that's something that we always try and do.
Again, a bit like planning, we've got over 30,000 sites. So sometimes things might not be done as to the absolute highest standard. We need to make sure that that goes towards that case. But the code as it stands, we think is, has been very good news. And certainly if the code went backwards, rural coverage ambitions would go backwards as well.
Speaker 22
Just on that, has the code led to any more conflict between operators and landowners, or has it been the opposite?
Speaker 3
If we look to Scotland from a Cellnex point of view, only one, we've only ended up with one court case to renew our leases. So the rest have been done consensually. And there's similar stats available at kind of an industry level about how few court cases have resulted in that. As George says, we strive to do the best we can. We do really a large number of leases.
And part of our approach is we ensure that we fund landowners to be professionally represented and independently represented so they get a fair deal in this process. But actually if you look at the volume of court cases, it's very, very low. And a lot of them are with a single company as opposed to individual landlords.
Speaker 3
Yeah, I mean, as I say, from a Cellnex point of view, as I say, we've renewed 266 and only one has resulted in needing to get a court determination to resolve it. So it's been largely achieved consensually.
Speaker 7
I'd just say when you do get concerns about planning or code issues and you know who the operator is, please tell us and we will work with you. We get a lot of casework already, but we're always open to more. And it does help and it does close that loop because we can then look at what's happened. If something has happened and hasn't followed the process, we can make sure it does. So please let us know.
Thank you.
Patricia Ferguson
Thanks, McDonald. Sorry, that's for panel two. Yes, sorry. You're quite right to correct me.
That's actually our last question to this panel. So, um, thank you all very much. That's been very, very interesting. Um, Mr. Robinson, I think we'll be getting you frequent flyer miles for the future. But it's, um, very helpful to hear your experience and your organization's interest.
So thank you very much for this morning. We very much appreciate it. Thank you.
Grateful for the invite. Thank you.
Patricia Ferguson
And welcome to our second panel this morning. Could I ask you both just to say your names and your job titles, please?
I'll start with Ms. Scott.
Yeah, Lorna Scott from NFU Scotland. I am the senior policy manager for climate, land and business for NFU Scotland.
Anna Gardiner
And I'm Anna Gardiner. I'm senior policy adviser for business and property at Scottish Land & Estates, representing rural business across Scotland.
Patricia Ferguson
Thank you both very much. Our first question to this panel is from Angus MacDonald this morning.
Speaker 66
Yes, just to disclose that Anna Gardiner's family and my family are old family friends.
Noted.
Angus Francis MacDonald
Thank you. Anna, the government has reduced the number of planned total non-spot masts in Scotland.
And what is your understanding for this reason? And they were originally chosen to meet government objectives rather than focusing on areas that would help the local community. What's your view on how the siting of masts could be improved?
Anna Gardiner
Okay. To answer the sort of the first part there, I think that my understanding is the rationale behind the, or the rationalization of the masts number of masts was after an important review essentially. I believe that the whole policy behind landmass was built on the premise that the previous approach, which was trying to address population, wasn't working fast enough.
So, you know, the whole principle of thinking, okay, let's do landmass, is completely understandable. I think, however, the approach was probably done from a desktop situation, not taking into proper account what the landmass of Scotland actually looks like. And, yeah, I think there's some brilliant quotes around the place of the penny dropping about what the landmass actually looks like. I think what happened then was it became a numbers exercise.
It was essentially the approach to landmass was still designed to be addressing population, but I think as things went on, it just moved across into just getting masts up to cover as much percentage of the land as possible, job done. Then the detailed surveys and things with the review showed that actually maybe this wasn't the best use of money, and that was obviously all coupled with a lot of pressure from rural organisations, which essentially was, I mean, I suppose the very much the case that organisations that are usually at loggerheads with each other coming together over a point is quite a good signal that something is wrong here. And I think the message got through, and that is why the whole approach pivoted and moved towards trying to focus things much more on population need, public sector, public services, transport and suchlike.
But I think that moving on to your point about how could site selection be improved, covering land does not equal addressing connectivity needs. And I think that, as I said before, the original purpose had been lost. And I think if you take Mr Doogan's constituency, the village of Stanley as a very clear example of this, that village is in a partial not-spot even though actually thousands of people do not have connectivity at all. They weren't on the TNS program, they were not on the PNS program. They are still without connectivity.
And Stanley is not an inaccessible place. You know, it's a hop, skip and a jump from Perth.
It is relatively accessible, but they have got very little connectivity. So if site selection is operating in a way that a place like that isn't getting connectivity, you know, there are definitely improvements that can be made. And I think the question should really be where, not where should we build a mast, it should be how do we connect this community? Because if the mast approach isn't working, something else has got to be done. And I think Mr. Robertson in the earlier session hit the spot on the head when he talked about satellite and the use of satellite.
And satellite is being used increasingly in rural areas. You can rock up to B&Q, you can buy your Starlink satellite, you can plug it in, subscribe and you're out the blocks. People are taking matters into their own hands. The question is, is that correct?
And I've probably babbled on for too long, so I probably should...
Angus Francis MacDonald
I'm sure you don't know the answer to this, but my recollection is that the Shared Rural Network was going to cost about five hundred million pounds. It was a previous government, a Scottish Conservative proposal to do the Shared Rural Network on landmass. The current government have changed that, and I believe they've saved a great deal of money, but that money has not been reallocated to covering the empty spots. Is that your understanding, or do you just not know?
Anna Gardiner
I don't know the answer to it, but I haven't seen any evidence that any effort has been made to address the areas that are still lacking in any form of connectivity.
Patricia Ferguson
Can I ask whether you think the Electronic Communications Code strikes the right balance between mobile operators and landowners?
Anna Gardiner
I think the simple answer is no. You know, we do support the underlying objective of it, which was to improve connectivity. But essentially the operator powers and rights have expanded so much at the same time the compensation for hosting has gone down significantly.
And basically the seesaw has tipped so far that it is impossible to suggest that there is balance.
Lorna Scott
Yeah, I would agree with what Anna's just said there. I think our members particularly, as she's just noted, the compensation has gone down significantly, but the hassle factor has not decreased in any reasonable way. These pieces of infrastructure quite rightly need to be improved and upgraded regularly, or there might be something goes wrong, they need to be fixed. Every time that that happens, there needs to be engineers coming on site and coming through a farming operation, for example, and there isn't really much, if any, forewarning of when that's going to happen. And these are businesses trying to get on with the day-to-day work.
So that the kind of the management issues and disruption is still there with much lower compensation. So yes, our members certainly feel that it's it's tipped slightly too much in favor of the operator.
Patricia Ferguson
So from a landowner's point of view, how does the wayleave system actually operate then?
Anna Gardiner
Okay. I think that probably the easiest way to describe it is when a landowner is is approached, it's not a simple case of yes, no. They've got to consider how the proposal affects the existing farming or forestry, whatever rural business it is that's going on on that land.
They've also got to do a bit of crystal ball gazing because they've got to think, right, okay, if we do this, what does it mean for anything we might want to do in the future? So, for example, um, you might need an access route or a cable might need to be taken up, whether by pole, you know, fixed wire or, um, or underground. That all has massive implications of possibly future forestry plantation, a renewable project. There could be so many things that are on your, I would quite like to explore this as a, as a business expansion for the future. And that's all suddenly brought to the table and they've got to be thinking about it now.
This takes a lot of careful assessment and careful assessment takes time and usually quite a lot of professional advice. So that's solicitors, land agents, and basically anyone who's got more experience than typically someone who is more used to dealing with sheep. It is a considerable undertaking to take on a wayleave with limited knowledge. And I think it's one of those things that someone might only have to deal with this once in their life. They might never have had experience with it before and they're put under a lot of pressure to basically provide answers fast.
I think the challenge is that operators often approach the process as a binary exercise. they need their infrastructure in a particular location and they just want consent. they just want to get on with it. landowners have got this long-term connection to the land and they've got to consider not just that piece of infrastructure but they've got to think of its impact on their future management of their property in perpetuity.
Patricia Ferguson
so if we look at the code what provisions of the code cause greatest concerns? Lorna Scott first of all.
Lorna Scott
I suppose it is just that significant reduction in rent means that now you know so I was speaking to a member earlier this week and he was explaining that when his mast went up at the beginning of the 2000s he was actively helping that planning process because he knew that it was in the best interests of the community also his business it was bringing in diversification of his income quite frankly and he wanted it on his farm and he was very happy to do so.
So he was helping the operator in the planning process and through doing that, I think it was much smoother than perhaps other cases have been. But now because of, yeah, now it is not as profitable, but also it is, the mast is shared with other operators which is fine, but that means that more businesses now needing access to that site, so there's a more frequent disruption. And I mean he was telling me about how they have a cable on the ground basically and it was called self-burying, and what that means is the grass was to grow over it, but that's not a safe or responsible way of actually putting that cable down.
So he then has to adapt all of his management practices for this particular cable, even though that was not how I think it was originally planned. But so I suppose again, just going back to the original point, is the massive reduction in rents means that the compensation for that hassle is greatly reduced. And though in rural Scotland, of course, we really need these areas to be covered better, we also need to be aware of the fact that these are businesses and these are still farmers in these rural communities trying to operate successfully. So it's just about getting that balance in a more kind of sustainable manner so that hopefully going forward, disputes or issues are more easily resolved and kind of goodwill comes back into it, because that has been slightly eroded over the last 10 years.
Lorna Scott
Yeah, so that particular farmer, he used to get six and a half thousand a year, I think, and it's now one and a half thousand. So that's obviously one very specific case.
Anna Gardiner
I mean, just to add to Lorna's points there, I think the changes that were introduced by the code are sort of collectively problematic. So they sort of all kind of build on each other.
And I think that this reduction in rent versus the greater impact is possibly the best illustration of how the imbalance looks. I think that there was talk in the previous session about increased power, and I think this is actually quite a good example. When you have a mast which is up in the hills somewhere, typically it is actually generated, the power is generated by diesel generators, which you can have your climate thoughts on that in itself. But when you have a mast that is needing more power, that means more journeys to refill the diesel.
And I've seen some frankly appalling images of scarred peatlands because of this repeated journey with ATVs to basically refill the fuel. It's obviously not in every situation, but when we're working in a world where we're trying to protect our peatlands and where we're really moving towards a much more custodial approach to how land is managed, I think that these things are all very important to put into the mix.
Angus Francis MacDonald
To some extent this has been covered a little bit, but so we've talked about rent reductions, and I don't know if that rent reduction that your farmer Lorna Scott came up with is typical.
Do you get that as well?
Speaker 78
Is there an opportunity for negotiation or are you just told what the rent's going to be?
Anna Gardiner
The I think the approach of different operators and agents is different. Some collaborate and work very well with and they are typically will come to an agreement. In other situations it is quite a a difficult process. It's not necessarily just about the rent, but for example it could be about an access agreement. And there was one case in Argyll where a farmer was approached for a new agreement under the code rights.
The operators can update the agreement. The impact of that obviously is apart from anything else a reduced rent.
The pressure that was put on this couple was really very intimidating and quite aggressive. Before they could even actually employ an agent, the legal papers had been served on them and suchlike. And so the agent then had quite a lot of work having to do to essentially assist the process in order to sort of, you know, catch up. The pressure that is put on to some landowners, and particularly there seems to be an opportunist approach by some that basically tap into them not really knowing the process. And in that case, they were wanting to change the access route.
And in that case they were wanting to change the access route and the farmer did not want the access route changed or wanted it changed in a slightly different way to how they'd proposed it and they were not prepared to negotiate. And this, you know, this is where what my point about the wayleave process is really important. You know, the operators and their agents have got to understand that the farmers aren't difficult for no reason. It's really important to understand why they're saying actually perhaps not that route and give them time to actually go through that process. The operators were talking about the need for time when things are on the when the shoe's on the other foot, you know, when when equipment wants to be taken down, they wanted more time so they can address that.
But it's just the same.
Angus Francis MacDonald
Can I just cut in because I know that we're going to be pushed for time. In 2022, there's a survey of 500 farmers came out that showed that 35% of those surveyed were considering terminating their mast hosting arrangements. Are you seeing a move to them actually being terminated or is it a threat, not a reality?
Lorna Scott
I think it's possibly becoming or likely to become more of a reality. I think the frustration is just quite high and kind of just on Anna's point there, if if particularly farmers or crofters in challenging environments already where they're working, if they're raising an issue or concern about why they want an access route changed or why they want it over here instead of there, they're not doing it to be awkward, they're doing it because it probably will directly impact how they work and it probably will come out later in the in the period anyway.
So yes, I think that the statistics that folk are trying to get out of it is probably fairly accurate. And I think if this doesn't improve and if this goodwill that we've kind of seen previously in how this was approached, if that isn't kind of resolved in some way, it is likely that that will take place.
Angus Francis MacDonald
And just in short order, so the electronic communications code, does that specify the relationship, the financial relationship between mobile operators and the landowners, or is it, it's got nothing to do, it doesn't cover the mathematics, that's entirely due to the mobile phone operator's offer to the landowner?
Anna Gardiner
So yeah, so basically it doesn't give you a sort of a mathematical formula, but it sort of gives a sort of essentially a broad valuation methodology and it's essentially referred to sort of no network. So you've got to essentially, okay, if it's on agricultural land, it would be basing the valuation on agricultural land. Other valuation methodologies would take into account the possible other uses of that land and things like that. So yeah, which is why we are where we are, because that wasn't the case prior to the code.
Rosalind Jones.
Lillian Jones
Thank you very much. To both ladies, do you think resistance is building to hosting masts in rural Scotland? And if so, why?
Lorna Scott
Yes, I mean, just from going round the houses for coming here today and speaking to members that are dealing with this. And I was a farmer up in Shetland, so there's a few masts up there and we've had issues last year. I think it is, there is just kind of what I've already talked about, just that frustration and that hassle level that is still there and the disruption to farming operations. And I think just that lack of willingness to try and engage collaboratively early so that you can maybe see how we could avoid some of this coming further down the track. So yes, I think it is likely to increase and rumble on.
Anna Gardiner
A lot of it sort of comes down to essentially behaviors of operators and agents. And I need to stress that this is not all of them. You know, it's, it doesn't, there are just inevitably one or two bad eggs that basically make things very difficult. And yeah, bad news always travels a lot faster. And so there is constantly going to be this, what's in it for me, this is just so not worth it.
And then when you're being faced with quite aggressive, so quite often the first thing you know about a mast is you get a letter. And it, in that first letter you see they start shouting about code rights.
And so they're already threatening that if you don't let us do this, we're going to, you know, throw the book at you. And that's obviously never going to be a great start to negotiation. So the, the, yeah, I mean, I mean that's just a sort of a common sense bad, bad start out the blocks. But I think that, as Lorna's sort of touched on, it's like trying to get that early engagement. Little things like when planning consent was put in for the SRN masts, community engagement essentially involved writing to the local community council, if there was one.
Of course, local community councils were then expected to respond within a fortnight.
Local community councils quite rarely don't meet beyond once a quarter, let alone once a fortnight. And when you've got as many masts being put in as the Shared Rural Network initially proposed, some community councils were being faced with literally tens and tens of planning applications. They didn't have the capacity amongst their volunteer group to put together a comprehensive response, let alone straw poll the actual people who might be benefiting or otherwise in an area. So community engagement, landowner engagement early, and being transparent. So when the landowner has a question, actually answering that question.
And, you know, if they don't know the answer, find out the answer. But a lot of what I've heard is that basically very junior people coming to site surveys and things like that and simply not having that information at their fingertips.
And that doesn't help the relations and it builds a lack of trust because what are they hiding? They're probably not hiding anything, it's just that they haven't been briefed properly. But, you know, all of this would work a lot a lot better to it. But also I've pointed out before time, give give the landowners time to get proper advice because if they're advised properly, things are well should move forward in a much cleaner way. And also being fair in the terms because in any agreement you have to be fair on what the impact is.
But I think that the overriding message really is that if you've got strong statutory powers, they've got to be matched by strong accountability as well. And there is no method at the moment of complaining about poor behaviors by operators or their agents. There is scope that was set out in the Product Security and Telecommunications Infrastructure Act 2022, section 70 has not yet been implemented. That recognized the importance of operator conduct, but it's a chocolate teapot because it essentially set up a situation where the operators would be marking their own homework. So, you know, if the operators have a problem with proper accountability, that probably is a flag that there is an issue.
But if there isn't a problem, and the operators all sat here earlier today saying that, no, the code's working brilliantly. So, if there's no problem, they should have no fear of greater transparency and they should have no fear of greater oversight. And if they had that, it could well make a huge difference to the landowners.
Lillian Jones
Can I just ask what the consequences would be for Scotland's mobile connectivity if landowners withdrew from hosting infrastructure?
Anna Gardiner
Well, because of code rights, I don't think that's an option.
But if things were set more in a more balanced way, they probably would achieve connectivity a lot faster.
Lorna Scott
Yeah, I mean, I would just agree. And I think, I think the panel before slightly kind of touched on the appeals that they're going through and kind of the time it takes for them dealing with disputes and all that kind of thing and the money invest, that that takes up. And I just think a lot of those kind of issues that take up a lot of time and money could probably be resolved much earlier, much cheaper, much faster if there was a more balanced approach to it. So actually, if there was that more balanced approach, I think rolling it out is actually more likely to move faster.
Speaker 22
Yes, thank you, Chair. Just check, Anna, has there been an instance already where a landowner has been forced to have a mast on their land against their sort of will?
Anna Gardiner
The, there have been cases where it has gone all the way to the tribunal. It's not necessarily gone all the way, but typically it'll go all the way and then get withdrawn because the thing is that, you know, more often than not the tribunal cases relate to rents and other, other facts, but masts still are going ahead. Are you aware of any?
Speaker 22
Yes, in theory a landowner can be forced to accept a mast. It just hasn't happened as yet. Okay, thank you.
Lorna Scott
Well I think that's, that kind of threat with a stick there is why they don't tend to go to that level because it will just be such a heavy burden on that landowner to, to go through that process when there's such a high threat level.
Speaker 22
Yeah, no, I hear the threats before about pylons as well, the same sort of thing.
Anna Gardiner
So the cases tend to be on technicalities because, well, as I say, yeah, if they have the right to force it, so you know you're up against it. Thank you.
Patricia Ferguson
So I'm presuming therefore that you would like to see the code changed?
Anna Gardiner
I think that, you know, we're not arguing the code should be fundamentally rewritten, but I think that the balance within the code needs to be addressed.
And I think that it's quite clear that it's causing a lot more issues than not, and I think that alone is probably enough to build a strong case for just reviewing that framework.
Anna Gardiner
I think that the valuation process needs to reflect the full package of rights granted and therefore the impacts. I think that the code needs to recognise the increased intensity of use, and you know, that increased intensity doesn't come without those impacts.
And I think that as I mentioned before, it's really important that the accountability factor is strengthened. It's got to be made appropriate for the powers and rights set out in that under the code. And that has got to cover oversight of operator conduct. It's got to include a proper complaints procedure and a regular review that the code is striking the right balance between infrastructure delivery and property rights.
Lorna Scott
Yeah, I would agree with that. I think that complaints point is important, just having that kind of oversight of how the operators are behaving or operating and giving the people that are dealing with them some kind of safety net, as it were, I think would really help. Yeah, no, but I would agree with what Anna's just said.
Patricia Ferguson
Thank you both very much. That was very interesting and we're very grateful to you for coming to the committee this morning, but that concludes our session. So thank you very much again and order, order.